.
Water and Stone Mid Month Update:
Hey all. Just checking in with my progress on the Water and Stone cardigan for December’s 12 in 12. I’m so happy I went with the cables along both sides of the collar, and straight down the back. the symmetry pleases me, and it gives more ‘action’ to the knitting. Just a little more cable to make it more exciting.
I also added the sleeves as soon as I finished the skein after the sleeve split, because I’m afraid of how boring they are, and I want to use up every last yard. This way, I can just knit on the body until I run out of yarn.
Currently, my next right side row will be the beginning of the hip increases for the waist shaping, and I’ve got two full skeins of the Lorna’s Laces Shepherd Sport to go. Will see how long it gets! My goal is to finish up this week, so I can have it at the shop in time for the 12 in 12 celebration.
happy knitting!
kate